Home > News > Content
Ball Mill Commissioning
Dec 21, 2017

Ball Mill Commisioning

Inspect ball mill before starting, only when meets requirements as Follows: 

Tighten all of bolts as requirements

All security contacting signal and protect device should be flexible, interlock regular work, apparatus show correctly.

Check installation and performance of accessory equipments. After starting, material shall be unimpeded.

Clean up the site and dispose barrier effecting the operation of ball mill. After starting, prohibit anybody stand on the sides of ball mill.


 Start-up sequence

(1) Starting discharge equipment

(2) Start the mill

(3) Start feeding equipment