Home > News > Content
100 TPD Gold Ore Production Line Equipment Shipped To Congo
Jan 10, 2018

2018AEJNuv0ghf.jpg

January 4, 2018, snow suspended, 100 TPD Gold Ore Production Line Equipment we produce are completed loading and ready to send to Qingdao Port, then delivered to Congo.

2018AEJN5ureAR.jpg

Equipment includes Jaw crusher, fine Jaw Crusher, Flotation machine, Agitation Tank, Belt Conveyor, Diesel Motors, Desorption electrolysis equipment.

 2018AEJOas5faK.jpg

2018AEJOlTCm3e.jpg

 Congo customer inspected our factory in September last year. After visiting the on-site case of Shanxi gold production line, we signed a contract each other to start the equipment production of this project.

         IMG_20171229_124524--.jpg     IMG_20171229_164113.jpg

         IMG_20171229_164304.jpg    img_20180106_115021_副本.jpg

      Our company is with over 30 years of mine equipment manufacturing and R & D experience. The main business includes: dressing production line equipment manufacturing, mining equipment design and development, design and development of micro-mill and so on.

ZJ 工厂俯视图.jpg


If you are interested in our products, pls don ‘t hesitates to contact me:

E-mail: sales@hnxykj.com    www.sinoxkj.com                               

Welcome to join us!