Home > Exhibition > Content
Ball mill installation
Jul 22, 2016

A) installing the floor plan is designed around a user-based project, direction, location, and space for installation as shown;

B) under surface of the body should be pragmatic, bottom surface level after level adjustment is not more than 1.5/1000;

A) cleared foreign bodies within the installed equipment base reserved hole, hole in the wall without dirt, grease, water and other liquids;

B) after you opened the box, use proper lifting equipment (cranes/forklifts) to move the host to the installation location;